Projects
Our Projects
Recent Work
Silo Weigher assembly
WF Industries was engaged to design, fabricate and fit a modification to a silo base to allow 3 load cells to measure the weight of the silo during production.
Processing Factory Shed
A local processing and packing facility wished to upgrade their current factory, WF Industries Fabricated and installed the new structural steel over the existing factory.
Fly Wheel Boring
A local client required a breakdown service to bore out two new jaw crusher flywheels from 8 ½ inch to 9 inch on a Sunday night, Flywheels returned to site Monday morning for fitment.
Pit Grate Fabrication
A return customer was looking for a solution to prevent a possible truck rollover when unloading. We designed, fabricated and installed the modifications on 7 dump pits.
740 Rebuild
We where contracted to carry out a 740 rebuild in our workshop, repairs included. New suspension pads, all bushes and pins replaced including articulation, with 11 holes line bored.
Service Station Erection
Recent erection of structural steel for a service station and kiosk.
Hopper Repair
Lower weigh hopper replacement, from measure up, fabrication and onsite fit out for an Armidale Customer.
Pan Replacement
Feeder pan replacement for a local mine, a 6 man crew was supplied for dayshift with another local company providing nightshift.